Accessory Installation
-
Peel backing from adhesive side of foam and apply foam pieces 8 and 7 to underside of roof panel within etched dash marks.
-
Install six U-nuts 6 onto roll-cage mounting plates.
-
Install front of roof panel with two spacers 5 (between roof and U-nut), two washers 3, and two fasteners 4.
Do not torque fasteners at this time. -
Install roof panel with two washers 3 and two fasteners 4. Torque four front fasteners 4 to specification.
TORQUEFront Roof Fasteners 4:
8 ft-lbs (11 N·m)
-
With front of roof secured to roll-cage, begin to slowly pull roof back so that it molds to the roll-cage’s curvature.
-
Install rear of roof with two washers 3 and two fasteners 2.
TORQUERear Roof Fasteners 2:
8 ft-lbs (11 N·m)