Accessory Installation
Storage Bin Preparation
-
Measure hole from the wall to the center of the hole. Mark drill point.
MEASUREMENTMeasurement A:
1.40 in (35 mm)
MEASUREMENTMeasurement B:
2 in (50 mm)

-
Drill hole in bottom of storage bin.
MEASUREMENTMeasurement:
1 1/4 in (32 mm)

-
Measure from the wall to the center of the first hole. Mark drill point.
MEASUREMENTMeasurement A:
1 in (24 mm)
MEASUREMENTMeasurement B:
3.20 in (81 mm)

-
Measure from the wall to the center of the second hole. Mark drill point.
MEASUREMENTMeasurement C:
1.50 in (37 mm)
MEASUREMENTMeasurement D:
0.70 in (17 mm)

-
Drill two holes.
MEASUREMENTMeasurement:
1/4 in (6 mm)

RIDE COMMAND+ Plug-In Installation
-
Install RIDE COMMAND+ Plug-In (sold separately) on four storage bin posts with four screws 5. Tighten until fully seated.
Do not overtighten.
-
Install grommet 2 on harness 1 near the plug-in connector 6F.

-
Put harness 1 connector 6F through 1 1/4 in hole. Install grommet 2 in hole.

-
Connect plug-in connector to 6F connector.

-
Route harness 1 under storage bin. Install two push pins 3 in 1/4 in holes.

-
Unplug diagnostic port 8F from cap on vehicle. Location of port depends on model year.
-
Model Year 2022+

-
Model Year 2021 and older

-
-
Connect harness diagnostic connector 8M to recently disconnected diagnostic port 8F.

-
Connect harness chassis connector 8F to empty cap on vehicle.
